Verify relay pickup, timing, and trip settings

Check insulation integrity of relay wiring

Measure resistance of relay contacts
Confirm relay trips/closes correctly under simulated faults
Verify correct wiring polarity for CT/PT circuits

Inject test current/voltage to simulate fault conditions

Apply actual primary current to verify end-to-end protection

Verify time-current characteristic curves

Check differential protection balance and sensitivity

Test ground fault detection sensitivity and timing

Verify zone settings and reach for line protection

Measure VA burden of relay on CT/PT secondary

Verify current transformer ratio and polarity

Verify potential transformer ratio and polarity

Measure DC resistance of windings to detect faults

Verify transformer turns ratio matches nameplate

Test insulation between windings and core/ground

Compare 60s and 30s IR readings

Measure insulation dielectric losses

Test oil breakdown voltage per IEC 60156

Identify internal faults via dissolved gases in oil

Measure water content in transformer oil (Karl Fischer)

Measure leakage impedance and load losses

Verify gas-actuated protection relay operation

Test on-load tap changer operation and transition

Assess bushing insulation condition

Verify bushing CT tap ratios

Confirm transformer tank and neutral are properly earthed

Detect insulation defects, voids, or weak spots

Measure dielectric losses in cable insulation

Verify conductor continuity end-to-end

Confirm correct phase identification and polarity

Test outer sheath for damage using DC voltage

Locate faults using Time Domain Reflectometry

Verify correct bonding/earthing of cable sheaths

Measure cable capacitance for system studies

Final acceptance test at 2-3x rated voltage

Visual and electrical check of terminations/stress cones